THERMATynk TM-011-MINERAŁ SZARY is a thin-layer, decorative structural plaster intended for manual application of internal and external plasters and in building insulation systems. It is used on all mineral substrates, such as cement, cement-lime, gypsum, plasterboards or concrete.
- for indoor and outdoor use,
- available structures and grain sizes,
- excellent vapor permeability,
- perfect structure,
IMPORTANT INFORMATION:
- Drying time: 12 – 48 hours,
- Application temperature: +5°C to +28°C
- Shelf life: 9 months,
- Mixture proportions: from 4.5 L - 5.0 L of water per 25 kg bag,
- Application method: manual,
AVAILABLE STRUCTURES AND GRIT SIZING:
Lamb 1.5 mm and 2.0 mm
Woodworm 1.5 mm and 2.0 mm
APPLICATION:
THERMATynk TM-011-MINERAŁ SZARY is a thin-layer, decorative structural plaster intended for manual application of internal and external plasters and in building insulation systems using the "light-wet" method. It is used on all mineral substrates, such as: cement, cement-lime, gypsum, plasterboards, concrete and others,
PROPERTIES:
It is a mineral mixture based on white cement and other filling agents as well as carefully selected fractions of appropriate aggregate thickness. By adding appropriate agents, THERMATynk-TM-011 GRAY MINERAL is resistant to washing and water.
SUBSTRATE PREPARATION:
The substrate should be stable, load-bearing and free from all types of contamination. Old paint and plaster coatings with insufficient adhesion should be removed and damaged plasters should be repaired. Prime substrates made of lime, lime-cement and cement plasters, concrete and the reinforcing layer with THERMAGrunt-AM.
The use of THERMAGrunt-AM primer significantly strengthens the substrate, reduces its absorbency and facilitates the application of plaster. Fresh, traditional cement, cement-lime and lime plasters used as a base layer should dry for at least 21 days.
MORTAR PROPORTIONS:
THERMATYNK-MINERAŁ GRAY is prepared by pouring the entire contents of the bag into a container with a measured amount of water (4.5 - 5.0 liters of water per 25 kg bag) and mixing mechanically until a uniform mass is obtained without lumps. The mortar is ready for use after approx. 10 minutes. and after mixing again, during which the consistency can be adjusted according to the conditions of use. Ready mortar should be used within 1.5 hours. During work, it is recommended to stir the mortar from time to time to uniform the consistency.
EXECUTION:
Apply the plaster to the substrate using a smooth stainless steel trowel to the grain thickness and remove the excess. Depending on the application conditions, the absorbency of the substrate, the ambient temperature and the consistency of the mortar, after an appropriate time, rub the plaster with a plastic trowel to the desired texture. After a short time, when the mass does not stick to the tool, texture the plaster using a plastic trowel held flat. The plaster can be rubbed vertically, horizontally, in a circular or crosswise motion, thus obtaining various textures. The plaster should be applied using the wet-on-wet method to avoid visible cuts. Try to plan the work in such a way that technological connections are planned, for example, in the corners and bends of the building, under downpipes, at the junction of colors, etc. The plastered surface should be protected, both during the work and after the plastering, from direct sunlight, wind and precipitation. The drying time of the plaster, depending on the substrate and the surroundings, during the work and drying of the plaster, for a minimum period of 24 hours, should be from +5°C to +28°C.
The plastered surface can be painted using facade paints 2-6 weeks after finishing plastering.
RECOMMENDATIONS:
The manual specifies the scope of use of the product and the recommended method of performing the work, but cannot replace the professional preparation of the contractor. The manufacturer guarantees the quality of the product, but has no influence on the conditions and method of its use.
COMMENTS:
The mortar contains cement. With water it gives an alkaline reaction. Protect eyes and skin.
If the eye is blocked, rinse with plenty of water.
STORAGE:
Store in the original closed packaging in a dry place on pallets.
Protect against moisture!!!
SHELF PERIOD:
9 months from the production date indicated on the packaging.
PACKAGING:
25 kg bag,
THE QUANTITY ON THE PALETTE:
25 kg x 48 pieces = 1200 kg. PALETTE